| 1 | Utility-scale wind farm | 1.5–5 MW per converter | Variable-speed doubly fed induction generator or full-converter turbine | Approximately 690 V generator-side input; exact voltage depends on turbine design | 690 V low-voltage output with step-up transformer to medium voltage | Three-phase, grid-following or grid-forming configuration | Forced-air or liquid cooling; indoor power-converter cabinet or modular container | Fault ride-through, reactive-power control, harmonic performance, service support, and grid-code compliance | Coordinate transformer impedance, grounding, cable shielding, protection settings, and medium-voltage switchgear | Inspect cooling circuits and filters monthly; check power connections, firmware, alarms, and thermal data at least annually |
| 2 | Large onshore turbine | 500 kW–2 MW | Permanent-magnet synchronous generator or electrically excited synchronous generator | Variable-frequency three-phase AC rectified to a controlled DC link | 400–690 V AC; transformer connection commonly used for collection networks | Three-phase full-scale power converter | Forced-air cooling; IP54 or higher cabinet commonly selected for protected turbine nacelles | Converter overload capability, low-voltage ride-through, efficiency, and access to replacement power modules | Install with adequate ventilation, cable bend radius, surge protection, and separation between power and control wiring | Torque-check terminals during scheduled service; clean heat sinks and verify insulation resistance and earth continuity |
| 3 | Medium onshore turbine | 100–500 kW | Permanent-magnet synchronous generator, squirrel-cage induction generator, or wound-rotor generator | Wide variable-frequency input; rectifier and DC-link voltage are matched to generator design | 380–480 V AC, three-phase | Full-converter or partial-scale converter | Air-cooled cabinet; outdoor installations generally require IP54–IP65 protection | Input-voltage window, maximum current, braking strategy, harmonic distortion, and remote monitoring | Provide a dedicated disconnect, correctly sized conductors, surge protective devices, and clear service access | Review event logs monthly; inspect fans and filters every 3–6 months; perform electrical tests annually |
| 4 | Community wind project | 50–250 kW | Variable-speed permanent-magnet or induction generator | Variable-frequency AC with rectified DC-link operation | 400 V or 480 V AC, three-phase | Grid-tied full-converter system | Natural or forced-air cooling; weatherproof outdoor cabinet preferred | Simple commissioning, local serviceability, anti-islanding protection, and compatibility with utility export limits | Confirm utility interconnection approval, phase sequence, grounding electrode system, and emergency shutdown access | Clean air passages every 6 months; test shutdown functions and inspect cable glands annually |
| 5 | Small commercial wind turbine | 20–100 kW | Permanent-magnet synchronous or induction generator | Typically 200–800 V variable-frequency generator input | 208–480 V AC, three-phase | Grid-following converter with programmable export control | Air-cooled, wall-mounted or floor-standing cabinet; IP54 or higher for exposed locations | Wide MPPT or generator-tracking range, low standby consumption, monitoring, and local grid-code settings | Install on a rigid, non-combustible surface with ventilation clearance and a lockable AC disconnect | Check fan operation, terminal temperature, fault history, and enclosure seals every 6–12 months |
| 6 | Agricultural and rural site | 10–50 kW | Permanent-magnet synchronous generator or induction generator | Variable-frequency three-phase input; voltage must match the generator rectifier stage | 230–400 V AC, three-phase | Grid-tied inverter with configurable reactive-power control | Passive or forced-air cooling; IP65 enclosure is suitable for dusty outdoor environments when correctly installed | Dust resistance, surge protection, wide operating temperature range, and ease of replacement | Use a short, protected cable route; install external overcurrent protection and maintain manufacturer-required clearances | Remove dust and debris every 3–6 months; inspect surge protection and grounding before storm seasons |
| 7 | Hybrid wind and battery system | 5–100 kW wind input | Permanent-magnet synchronous generator combined with battery storage and optional photovoltaic input | Wind-generator AC rectified to a DC bus; battery voltage commonly 48–800 V DC depending on system size | 230–480 V AC, single-phase or three-phase | Bidirectional grid-forming or grid-following inverter system | Forced-air cooling; battery and inverter compartments should be thermally separated | Battery voltage compatibility, state-of-charge control, islanding capability, black-start function, and energy-management integration | Follow battery isolation procedures, coordinate DC fuses and contactors, and configure export, backup, and anti-islanding settings | Check battery ventilation and protection logs monthly; test backup transfer and protection functions at least annually |
| 8 | Remote or weak-grid installation | 10–250 kW | Variable-speed synchronous or induction generator | Variable-frequency generator input with a controlled DC link | 230–480 V AC, three-phase; medium-voltage transformer may be added | Grid-forming or grid-supporting converter | Liquid-cooled or forced-air design; enhanced environmental protection recommended | Voltage and frequency support, short-circuit behavior, black-start capability, and stable operation with generators | Complete a site power-quality study; coordinate frequency droop, voltage limits, generator controls, and grounding | Trend voltage, frequency, temperature, and alarm data; inspect cooling and protection systems every 3–6 months |
| 9 | Coastal or high-humidity site | 20–500 kW | Permanent-magnet synchronous or doubly fed induction generator | Variable-frequency AC matched to generator and converter architecture | 400–690 V AC, three-phase | Full-converter or partial-scale converter with reactive-power control | Sealed IP65 enclosure, corrosion-resistant coating, filtered ventilation, or liquid cooling | Humidity control, anti-corrosion treatment, insulation monitoring, and salt-mist resistance | Use stainless or corrosion-protected hardware, sealed cable glands, condensation heaters, and suitable drainage | Inspect corrosion and condensation monthly; clean filters quarterly; perform insulation and earth tests annually |
| 10 | Small distributed wind system | 1–20 kW | Permanent-magnet alternator or small induction generator | Typically 24–800 V variable-frequency input, depending on turbine architecture | 120–240 V single-phase or 208–480 V three-phase | Grid-tied inverter with integrated rectifier and diversion-load control where required | Passive or fan-assisted cooling; compact IP65 outdoor enclosure | Certified anti-islanding, turbine overspeed protection, diversion-load compatibility, and straightforward commissioning | Install a dedicated isolator, correct overcurrent protection, surge protection, and a visible emergency stop where required | Inspect wiring, enclosure seals, fans, and diversion-load operation every 6–12 months |